Below is a listing of projects past and present carried out by the Saint Lucia Bureau of Standards.
Determination of the silanol group content on the surface of fumed silica — Part 2: Thermogravimetric analysis method
00.00 Proposal for new project received
Ships and marine technology — Test method for marine magnetic compass safe distance
00.00 Proposal for new project received
Uncoupling membrane for ceramic tile installation
00.00 Proposal for new project received
Industrial automation systems and integration — Numerical control systems for machine tools — Part 3: safety requirements
00.60 Close of review
Road vehicles — Low micron fuel filter efficiency
00.00 Proposal for new project received
Road vehicles — Vehicle domain service (VDS) — Part 2: Application layer and sequence requirements
00.00 Proposal for new project received
Road vehicles — Vehicle domain service (VDS) — Part 2: Application layer and sequence requirements
00.00 Proposal for new project received
Road vehicles — Vehicle domain service (VDS) — Part 3: Network and transport layer requirements
00.00 Proposal for new project received
Road vehicles — Vehicle domain service (VDS) — Part 3: Network and transport layer requirements
00.00 Proposal for new project received
Road vehicles — Vehicle domain service (VDS) — Part 4: Physical and data link layer requirements
00.00 Proposal for new project received
Road vehicles — Vehicle domain service (VDS) — Part 4: Physical and data link layer requirements
00.00 Proposal for new project received
Railway infrastructure — Rail welding — Part 3: Gas pressure welding
00.60 Close of review
Intelligent transport systems — Functional safety for vehicle-to-vehicle cooperative functions (FSV2V) — Part 1: Platooning
00.00 Proposal for new project received
Testing method for steel tyre cord — Part 2: Adhesion test
10.00 Proposal for new project registered
Road vehicles — Anti-fog coating for exterior lighting devices
00.00 Proposal for new project received
Intelligent transport systems — Management of electronic privacy regulations (MEPR)
00.00 Proposal for new project received
Recommended practices for formation damage evaluation of CBM — flow test and desorption measurement
00.60 Close of review