Below is a listing of projects past and present carried out by the Saint Lucia Bureau of Standards.
Off-road machinery — Secure High Speed Data Communication — Part 3: Security
00.00 Proposal for new project received
Nanotechnologies — Structural characterization of graphene oxide flakes: thickness and lateral size measurement using AFM and SEM
00.00 Proposal for new project received
Petroleum and natural gas industries — Non-metallic materials in contact with media related to oil and gas production — Part 3: Thermosets
00.00 Proposal for new project received
Petroleum and natural gas industries — Non-metallic materials in contact with media related to oil and gas production — Part 4: Fiber-reinforced composite
00.00 Proposal for new project received
Test methods for sprayed concrete — Part 2: Sampling fresh and hardened concrete
00.60 Close of review
Test methods for sprayed concrete — Part 3: Measurement of compressive strength
00.60 Close of review
Irrigation and drainage equipment and systems — Guideline on the implementation of pressurized irrigation systems — Part 3: Sprinkler irrigation
00.00 Proposal for new project received
Irrigation and drainage equipment and systems — Guideline on the implementation of pressurized irrigation systems — Part 4: Mechanized irrigation
00.00 Proposal for new project received
Internal protection by polymeric lining for ductile iron pipes - Requirements and test methods — Part 3: Polyethylene lining
00.00 Proposal for new project received
Industrial trucks — Additional requirements for automated functions on trucks
00.00 Proposal for new project received
Ships and marine technology — Shipboard waste on inland navigation vessels — Part 2: Arrangement and management of port waste reception facilities
00.00 Proposal for new project received
Oil and gas industries including lower carbon energy — Bulk material for offshore projects — Standard schedule for architectural doors
00.00 Proposal for new project received
Oil and gas industries including lower carbon energy — Bulk material for offshore projects — Design for architectural supports
00.00 Proposal for new project received
Ships and marine technology — Marine environment protection — Arrangement and management of port reception facilities in the arctic
00.00 Proposal for new project received