Below is a listing of projects past and present carried out by the Saint Lucia Bureau of Standards.
Monitoring and dose assessment for occupational exposures to radon and thoron
00.00 Proposal for new project received
Irrigation techniques — Remote monitoring and control for irrigation — Part 1: General considerations
00.00 Proposal for new project received
Irrigation techniques — Remote monitoring and control for irrigation — Part 4: Functionality
00.00 Proposal for new project received
Petroleum and natural gas industries - External coatings for buried or submerged pipelines used in pipeline transportation systems — Part 6: Multilayer fusion-bonded coatings
00.00 Proposal for new project received
Earth-moving machinery — Collision warning and avoidance — Part 4: Risk Area and Risk Level for Track movement and Swing/rotation
00.00 Proposal for new project received
Earth-moving machinery — Collision warning and avoidance — Part 5: Risk area and risk level for other forms of motion
00.00 Proposal for new project received
Fluid flow in closed conduits — Connections for pressure signal transmissions between primary and secondary elements
00.00 Proposal for new project received
Mechanical vibration — Rotor balancing — Part 40: Blade moment balancing
00.00 Proposal for new project received
Plastics — Determination of thermal conductivity and thermal diffusivity — Part 8: Modified transient plane source (MTPS) method
00.60 Close of review
Life cycle management of concrete structures — Part 3: Execution stage
10.00 Proposal for new project registered
Graphic Technology — Requirements for communication of environmental aspects of printed products — Part 3: Textile printing
00.00 Proposal for new project received
Ships and marine technology — Transmitting heading devices (THDs) — Part 1: Gyro-compasses
00.00 Proposal for new project received
Ships and marine technology — Transmitting heading devices (THDs) — Part 2: Geomagnetic principles
00.00 Proposal for new project received
Ships and marine technology — Transmitting heading devices (THDs) — Part 3: GNSS principles
00.00 Proposal for new project received
Robotics — Modularity for service robots — Part 203: Information Model for Hardware
00.60 Close of review
Diagnosing moisture damage in buildings and implementing countermeasures — Part 3: Addressing known moisture damage conditions
00.00 Proposal for new project received
Dentistry — Manual toothbrushes — Resistance of tufted portion to deflection
00.00 Proposal for new project received