Below is a listing of projects past and present carried out by the Saint Lucia Bureau of Standards.
Geometrical product specifications (GPS) — Partition — Part 4: Explicitly defined partitioning
00.00 Proposal for new project received
Method for the justification of fire partitioning in water cooled nuclear power plants (NPP)
00.00 Proposal for new project received
Non-destructive testing — Long-range inspection of above-ground pipelines and plant piping using guided wave testing with axial propagation
00.00 Proposal for new project received
Superconducting magnets standards - Requirements to the safety systems raised by the application of the superconducting technology in nuclear fusion facilities
00.00 Proposal for new project received
Iron ores — Determination of loss on ignition by thermogravimetric method — Part 2: Multiple samples — Single ramping and multiple fixed temperature furnaces
00.00 Proposal for new project received
Iron ores — Determination of loss on ignition by thermogravimetric method — Part 2: Multiple samples — Single ramping and multiple fixed temperature furnaces
00.60 Close of review
Management of condition monitoring of machine systems
00.00 Proposal for new project received
Welding consumables — Tubular cored electrodes for gas-shielded and non-gas-shielded metal arc welding of high strength steels — Classification
00.00 Proposal for new project received
Martial arts – Taijiquan — Part 1: Chen Style
00.00 Proposal for new project received
Martial arts – Taijiquan — Part 2: Yang Style
00.00 Proposal for new project received
Martial arts – Taijiquan — Part 5: Sun Style
00.00 Proposal for new project received
Thermal insulation products — Determination of ageing by settlement — Part 2: Blown loose fill and injected insulation for cavity walls and timber and steel framed walls, simulating vibration
00.60 Close of review
Thermal insulation products — Determination of ageing by settlement — Part 3: Determination of settlement for blown or injected loose fill insulation for closed cavities, simulating humidity and temperature cycling
00.60 Close of review
Thermal insulation products — Determination of ageing by settlement — Part 4: Blown loose-fill insulation for ventilated attics, vibration
00.60 Close of review
Condition Monitoring and Diagnostics of Machine Systems – Requirements for qualification and assessment of personnel — Part 10: Condition Monitoring Manager
00.00 Proposal for new project received