Below is a listing of projects past and present carried out by the Saint Lucia Bureau of Standards.
Respiratory protective devices — Methods of test and test equipment — Part 11: Determination of field of vision
00.00 Proposal for new project received
Stationary source emissions — Manual and automatic determination of velocity and volume flow rate in ducts — Part 2: Automated measuring systems
00.00 Proposal for new project received
Biotechnology — Gene delivery systems — Part 3: Lipid nanoparticles
00.00 Proposal for new project received
Biotechnology — Guidance and requirements for assays used in the detection of anti-adeno-associated viruses (AAV) antibodies when evaluating preexisting immunity to AAV
00.00 Proposal for new project received
Dentistry — Test methods for dental unit waterline biofilm treatment
00.00 Proposal for new project received
Ophthalmic instruments — Optical coherence tomographs — Part 2: Optical coherence tomographs for the anterior segment of the human eye
00.00 Proposal for new project received
Tobacco heating systems - Determination of selected carbonyls
00.00 Proposal for new project received
Optics and optical instruments — Field procedures for testing geodetic and surveying instruments — Part 10: UAV photogrammetry systems
00.60 Close of review
Underwater acoustics – Quantities and procedures for description and measurement of underwater sound from ships — Part 4: Survey method for ships of opportunity
00.00 Proposal for new project received
Gaseous hydrogen land vehicle refuelling connection devices — Part 2: Flow capacities greater than 120 g/s
00.00 Proposal for new project received
Textiles — Determination of deodorant property — Part 6: Gas chromatography method using automated dosing and sampling
00.60 Close of review
Electrically propelled road vehicles — Conductive power transfer — Safety requirements
00.00 Proposal for new project received
Traceability of measurement of particle size distribution by the laser diffraction method
00.00 Proposal for new project received
Natural gas — Calculation of methane number of gaseous fuels for internal combustion engines — Part 1: MNc method
10.00 Proposal for new project registered
Natural gas — Calculation of methane number of gaseous fuels for internal combustion engines — Part 2: PKI method
10.00 Proposal for new project registered
Thermal Performance of windows and doors — Determination of solar heat gain coefficient using natural sunlight
00.00 Proposal for new project received
GHG emissions during natural gas production and transport to LNG plant
00.00 Proposal for new project received
Foundry machinery — Safety requirements for cupola furnaces, ladles, pouring machines and associated equipment
00.60 Close of review