Below is a listing of projects past and present carried out by the Saint Lucia Bureau of Standards.
Measurement of radioactivity in urine-238Pu, 239Pu and 240Pu-Test method using alpha spectrometry and ICP-MS
10.20 New project ballot initiated
Plastic Scaffold Planks Performance and General Design Requirements
10.60 Close of voting
Lung ventilators and related equipment — Vocabulary and semantics — Part 2: High-frequency ventilation
10.60 Close of voting
Lung ventilators and related equipment — Vocabulary and semantics — Part 3: Respiratory care
10.20 New project ballot initiated
Gaseous fire-extinguishing systems — Physical properties and system design — Part 1: indirect
10.20 New project ballot initiated
Sterilization of health care products — Application of ISO/TS 22421 to the requirements for sterilizers used for the terminal sterilization of health care products containing aqueous liquid in sealed containers
10.60 Close of voting
Direct Fire Extinguishing (DFE) Pre-Engineered Systems for Unoccupied Cabinet / Enclosure Protection — Part 2: Direct
10.20 New project ballot initiated
Sensory analysis — Methodology — Consumer segmentation
10.20 New project ballot initiated
Service excellence — Requirements and guidelines for the application of ISO 23592 for E-commerce platform operators
10.20 New project ballot initiated
Rolling bearings--Linear roller bearings--Boundary dimensions and tolerances
10.00 Proposal for new project registered
Machinery for forestry — Winches — Part 1: Dimensions, performance and safety
10.20 New project ballot initiated
Sensory test variability: Addressing Precision, Accuracy, Repeatability, Replication and Reproducibility
10.60 Close of voting
Meat and fish products — Determination of volatile basic nitrogen — Semi-micro nitrogen determination method
10.60 Close of voting
Meat and meat products --Determination of nitrite and nitrate---Continuous Flow Analysis (CFA) method
10.00 Proposal for new project registered
Sludge recovery, recycling, treatment and disposal — Laboratory chemical conditioning procedure
10.20 New project ballot initiated