Below is a listing of projects past and present carried out by the Saint Lucia Bureau of Standards.
Stationary source emissions — Determination of volume flowrate and concentration of fluorinated compounds (FCs) and N2O in ducts of semiconductor and display processes
10.60 Close of voting
Space systems — Stable operation requirements for satellite attitude and orbit control system
10.20 New project ballot initiated
Ventilation systems for nuclear facilities — In-situ efficiency test methods for iodine traps with solid sorbent — Part 2: Radioactive CH3I method
10.20 New project ballot initiated
Ventilation systems for nuclear facilities — In-situ efficiency test methods for iodine traps with solid sorbent — Part 3: Cyclohexane method
10.20 New project ballot initiated
Corrosion control engineering life cycle of power transmission and transformation system-General requirement
10.60 Close of voting
Thermoplastic materials for piping systems — Determination of resistanceto slow crack growth under cyclic loading — Cracked Round Bar test method
10.60 Close of voting
Wheelchair seating — Part 11: Determination of perspiration dissipation characteristics of seat cushions intended to manage tissue integrity
10.00 Proposal for new project registered
Biotechnology — Gene delivery systems — Part 1: Vocabulary
10.20 New project ballot initiated
Biotechnology — Gene delivery systems — Part 2: Guide for methods for the qualification of viral vectors
10.20 New project ballot initiated
Textiles — Determination of deodorant property — Part 6: Gas chromatography method using automated dosing and sampling
10.20 New project ballot initiated
Ships and marine technology --Vertical escape ladders of offshore platforms
10.20 New project ballot initiated
Gas cylinders — Refillable permanently mounted composite tubes for transportation
10.60 Close of voting
Guidelines for the management of mobile toilets under Public Health Emergencies
10.60 Close of voting
Thermal insulation products — Exterior insulation and finish systems (EIFS) — Part 4: Site Verification
10.20 New project ballot initiated
Road vehicles — Service-oriented vehicle diagnostics (SOVD) — Part 1: General information, definitions, rules and basic principles
10.20 New project ballot initiated
Road vehicles — Service-oriented vehicle diagnostics (SOVD) — Part 2: Use cases definition
10.20 New project ballot initiated
Road vehicles — Service-oriented vehicle diagnostics (SOVD) — Part 3: Application programming interface (API)
10.20 New project ballot initiated
Electrically propelled road vehicles — Battery information — Part 2: End of life
10.60 Close of voting