Phone: +1 758-453-0049
E-mail: info@slbs.org
Bisee, Saint Lucia LC04301

Projects

Below is a listing of projects past and present carried out by the Saint Lucia Bureau of Standards.

Blockchain and Distributed Ledger Technology in relation to authoritative records, records systems, and records management

20.20 Working draft (WD) study initiated

ISO/TC 46/SC 11 more

Establishment of a master plan for water supply

20.20 Working draft (WD) study initiated

ISO/TC 224 more

Management of terminology resources — Companion to TermBase eXchange (TBX) — Part 2: RNG schema for TBX core

20.60 Close of comment period

ISO/TC 37/SC 3 more

Energy performance of buildings — Energy needs for heating and cooling, internal temperatures and sensible and latent heat loads — Part 4: Explanation and justification of ISO 52016-3

20.20 Working draft (WD) study initiated

ISO/TC 163/SC 2 more

Integrative design of the building envelope — General principles

20.99 WD approved for registration as CD

ISO/TC 205 more

Light and lighting – Commissioning of lighting systems in building– Explanation and justification of ISO/TS 21274

20.20 Working draft (WD) study initiated

ISO/TC 274 more

Anodizing of aluminium and its alloys — Characteristic values of anodic oxidation coatings

20.20 Working draft (WD) study initiated

ISO/TC 79/SC 2 more

Health informatics — Standardizing graphical content

20.99 WD approved for registration as CD

ISO/TC 215 more

Blockchain and distributed ledger technologies – Data flow model for blockchain and DLT use cases

20.20 Working draft (WD) study initiated

ISO/TC 307 more

Fire safety on lifts — Part 10: Comparison of worldwide safety standards on lifts for firefighters

20.20 Working draft (WD) study initiated

ISO/TC 178 more

Safety of toys — Part 8: Age determination guidelines

20.60 Close of comment period

ISO/TC 181 more

Issues and considerations for managing records in structured data environments

20.20 Working draft (WD) study initiated

ISO/TC 46/SC 11 more

Nanotechnologies — Occupational risk management applied to engineered nanomaterials — Part 2: Use of the control banding approach

20.20 Working draft (WD) study initiated

ISO/TC 229 more

Biodiversity — Vocabulary

20.20 Working draft (WD) study initiated

ISO/TC 331 more

Eco-Technoeconomic Analyses: Principles, requirements and guidelines

20.20 Working draft (WD) study initiated

ISO/TC 207/SC 5 more

Test methods for repair materials for water-leakage cracks in underground concrete structures — Part 1: Test method for thermal stability

20.60 Close of comment period

ISO/TC 71/SC 7 more

Test methods for repair materials for water-leakage cracks in underground concrete structures — Part 5: Test method for watertightness

20.60 Close of comment period

ISO/TC 71/SC 7 more

Test methods for repair materials for water-leakage cracks in underground concrete structures — Part 6: Test method for response to the substrate movement

20.60 Close of comment period

ISO/TC 71/SC 7 more