Phone: +1 758-453-0049
E-mail: info@slbs.org
Bisee, Saint Lucia LC04301

Projects

Below is a listing of projects past and present carried out by the Saint Lucia Bureau of Standards.

Polyethylene reinforced with short glass fibres (PE-sGF) piping systems for industrial applications — Part 3: Fittings

20.60 Close of comment period

ISO/TC 138/SC 3 more

Polyethylene reinforced with short glass fibres (PE-sGF) piping systems for industrial applications — Part 5: Fitness for purpose of the system

20.60 Close of comment period

ISO/TC 138/SC 3 more

Method of test for burning velocity measurement of A2L flammable gases

20.00 New project registered in TC/SC work programme

ISO/TC 86/SC 8 more

Health Informatics — Dynamic on-demand virtual private network for health information infrastructure

20.60 Close of comment period

ISO/TC 215 more

Copper, lead and zinc sulfide concentrates — Step-by-step procedure for the testing of static scales

20.20 Working draft (WD) study initiated

ISO/TC 183 more

Fire safety — Statistical data collection — Part 1: Overview of national fire statistics practices

20.20 Working draft (WD) study initiated

ISO/TC 92 more

Design using geosynthetics — Part 5: Stabilization

20.20 Working draft (WD) study initiated

ISO/TC 221 more

Iron ores — Determination of sodium content by X-ray fluorescence spectrometry

20.60 Close of comment period

ISO/TC 102/SC 2 more

Fire safety — Intentional Fires — General information

20.20 Working draft (WD) study initiated

ISO/TC 92 more

Blockchain and distributed ledger technologies - Overview of smart contract security good practice and issues

20.20 Working draft (WD) study initiated

ISO/TC 307 more

Surface chemical analysis — scanning probe microscopy — Guideline for experimental quantification of carrier concentration in semiconductor devices by using electric scanning probe microscopy

20.99 WD approved for registration as CD

ISO/TC 201/SC 9 more

Blockchain and Distributed Ledger Technology in relation to authoritative records, records systems, and records management

20.20 Working draft (WD) study initiated

ISO/TC 46/SC 11 more

Establishment of a master plan for water supply

20.20 Working draft (WD) study initiated

ISO/TC 224 more

Management of terminology resources — Companion to TermBase eXchange (TBX) — Part 2: RNG schema for TBX core

20.60 Close of comment period

ISO/TC 37/SC 3 more

Energy performance of buildings — Energy needs for heating and cooling, internal temperatures and sensible and latent heat loads — Part 4: Explanation and justification of ISO 52016-3

20.20 Working draft (WD) study initiated

ISO/TC 163/SC 2 more

Integrative design of the building envelope — General principles

20.99 WD approved for registration as CD

ISO/TC 205 more

Light and lighting – Commissioning of lighting systems in building– Explanation and justification of ISO/TS 21274

20.20 Working draft (WD) study initiated

ISO/TC 274 more

Anodizing of aluminium and its alloys — Characteristic values of anodic oxidation coatings

20.20 Working draft (WD) study initiated

ISO/TC 79/SC 2 more