Phone: +1 758-453-0049
E-mail: info@slbs.org
Bisee, Saint Lucia LC04301

Projects

Below is a listing of projects past and present carried out by the Saint Lucia Bureau of Standards.

Guidance for pure reference materials for small organic molecules

20.20 Working draft (WD) study initiated

ISO/TC 334 more

Polyethylene reinforced with short glass fibres (PE-sGF) piping systems for industrial applications — Part 3: Fittings

20.60 Close of comment period

ISO/TC 138/SC 3 more

Polyethylene reinforced with short glass fibres (PE-sGF) piping systems for industrial applications — Part 5: Fitness for purpose of the system

20.60 Close of comment period

ISO/TC 138/SC 3 more

Method of test for burning velocity measurement of A2L flammable gases

20.00 New project registered in TC/SC work programme

ISO/TC 86/SC 8 more

Health Informatics — Dynamic on-demand virtual private network for health information infrastructure

20.60 Close of comment period

ISO/TC 215 more

Copper, lead and zinc sulfide concentrates — Step-by-step procedure for the testing of static scales

20.20 Working draft (WD) study initiated

ISO/TC 183 more

Fire safety — Statistical data collection — Part 1: Overview of national fire statistics practices

20.20 Working draft (WD) study initiated

ISO/TC 92 more

Design using geosynthetics — Part 5: Stabilization

20.20 Working draft (WD) study initiated

ISO/TC 221 more

Iron ores — Determination of sodium content by X-ray fluorescence spectrometry

20.60 Close of comment period

ISO/TC 102/SC 2 more

Fire safety — Intentional Fires — General information

20.20 Working draft (WD) study initiated

ISO/TC 92 more

Blockchain and distributed ledger technologies - Overview of smart contract security good practice and issues

20.20 Working draft (WD) study initiated

ISO/TC 307 more

Surface chemical analysis — scanning probe microscopy — Guideline for experimental quantification of carrier concentration in semiconductor devices by using electric scanning probe microscopy

20.99 WD approved for registration as CD

ISO/TC 201/SC 9 more

Blockchain and Distributed Ledger Technology in relation to authoritative records, records systems, and records management

20.20 Working draft (WD) study initiated

ISO/TC 46/SC 11 more

Establishment of a master plan for water supply

20.20 Working draft (WD) study initiated

ISO/TC 224 more

Management of terminology resources — Companion to TermBase eXchange (TBX) — Part 2: RNG schema for TBX core

20.60 Close of comment period

ISO/TC 37/SC 3 more

Energy performance of buildings — Energy needs for heating and cooling, internal temperatures and sensible and latent heat loads — Part 4: Explanation and justification of ISO 52016-3

20.20 Working draft (WD) study initiated

ISO/TC 163/SC 2 more

Integrative design of the building envelope — General principles

20.99 WD approved for registration as CD

ISO/TC 205 more

Light and lighting – Commissioning of lighting systems in building– Explanation and justification of ISO/TS 21274

20.20 Working draft (WD) study initiated

ISO/TC 274 more