Phone: +1 758-453-0049
E-mail: info@slbs.org
Bisee, Saint Lucia LC04301

Projects

Below is a listing of projects past and present carried out by the Saint Lucia Bureau of Standards.

Plastics pipes and fittings — Peel decohesion test for polyethylene (PE) electrofusion assemblies of nominal outside diameter greater than or equal to 90 mm

20.20 Working draft (WD) study initiated

ISO/TC 138/SC 5 more

Plastics pipes and fittings — Decohesion test of polyethylene (PE) saddle fusion joints — Evaluation of ductility of fusion joint interface by tear test

20.20 Working draft (WD) study initiated

ISO/TC 138/SC 5 more

Calculation method of carbon dioxide emission intensity from iron and steel production — Part 3: Steel plant with electric arc furnace (EAF) and coal-based or gas-based direct reduction iron (DRI) facility

20.20 Working draft (WD) study initiated

ISO/TC 17 more

Geometrical product specifications (GPS) — Dimensional tolerancing — Part 1: Linear sizes

20.60 Close of comment period

ISO/TC 213 more

Space systems — Structural design — Loads and induced environment

20.99 WD approved for registration as CD

ISO/TC 20/SC 14 more

Tourism and related services — Tourist information and reception online and onsite services

20.20 Working draft (WD) study initiated

ISO/TC 228 more

Plastics — Polymer dispersions — Determination of free formaldehyde

20.99 WD approved for registration as CD

ISO/TC 61/SC 9 more

Aerospace — Characteristics of aircraft electrical systems

20.60 Close of comment period

ISO/TC 20/SC 1 more

Road construction and maintenance equipment — Asphalt mixing plants — Terminology and commercial specifications

20.60 Close of comment period

ISO/TC 195 more

Road construction and maintenance equipment — Powder binder spreaders — Terminology and commercial specifications

20.20 Working draft (WD) study initiated

ISO/TC 195 more

Road construction and maintenance equipment — Slipform pavers — Definitions and commercial specifications

20.20 Working draft (WD) study initiated

ISO/TC 195 more

Road vehicles — Blended fuels refuelling connector

20.20 Working draft (WD) study initiated

ISO/TC 22/SC 41 more

Lithium chloride — Determination of impurities — ICP-OES method

20.20 Working draft (WD) study initiated

ISO/TC 333 more

Tourism and related services — Restaurants — Vocabulary

20.60 Close of comment period

ISO/TC 228 more

Cranes and hoists — Selection of wire ropes, drums and sheaves

20.99 WD approved for registration as CD

ISO/TC 96/SC 3 more

Biobanking — Biobanking genetic material for biodiversity and conservation of genetic material — Part 1: Agricultural animal species

20.20 Working draft (WD) study initiated

ISO/TC 34/SC 16 more

Thermal insulating products for industrial installations — Mechanical properties testing at sub-ambient temperatures

20.20 Working draft (WD) study initiated

ISO/TC 163/SC 1 more

Bamboo drinking straws

20.20 Working draft (WD) study initiated

ISO/TC 296 more