Below is a listing of projects past and present carried out by the Saint Lucia Bureau of Standards.
Petroleum and natural gas industries — Piping systems on offshore production platforms and onshore plants — Part 1: Design
00.00 Proposal for new project received
Water quality – Application of LC-HRMS for non-target screening
00.00 Proposal for new project received
Information technology — Telecommunications and information exchange between systems — Control Protocol for Radio Frequency Directional Signal Transmission (RF-DST)
00.60 Close of review
Validation and verification of sustainability information — Part 1: General principles and requirements
00.00 Proposal for new project received
Optics and photonics — Vocabulary for telescopic systems — Part 5: Terms for night vision devices
00.00 Proposal for new project received
Industrial automation systems and integration — JT file format specification for 3D visualization
00.60 Close of review
Industrial automation systems and integration - JT file format specification for 3D visualization — Part 2: Vocabulary
00.00 Proposal for new project received
Industrial automation systems and integration — JT file format specification for 3D visualization — Part 4: JT 10.5
00.60 Close of review
Welding consumables — Procurement of filler materials and fluxes
00.00 Proposal for new project received
Optics and photonics — Test methods for telescopic systems — Part 6: Test methods for veiling glare index
00.00 Proposal for new project received
Optics and optical instruments — Test methods for telescopic systems — Part 8: Test methods for night-vision devices
00.00 Proposal for new project received
Ergonomics of the thermal environment — Evaluation of thermal environments in vehicles — Part 2: Determination of equivalent temperature
00.00 Proposal for new project received
Cleanrooms and associated controlled environments — Part 7: Separative devices (clean air hoods, gloveboxes, isolators and mini-environments)
00.00 Proposal for new project received
Petroleum and natural gas industries — Glass-reinforced plastics (GRP) piping — Part 1: Vocabulary, symbols, applications and materials
00.00 Proposal for new project received
Petroleum and natural gas industries — Glass-reinforced plastics (GRP) piping — Part 2: Qualification and manufacture
00.00 Proposal for new project received
Petroleum and natural gas industries — Glass-reinforced plastics (GRP) piping — Part 3: System design
00.00 Proposal for new project received
Petroleum and natural gas industries — Glass-reinforced plastics (GRP) piping — Part 4: Fabrication, installation and operation
00.00 Proposal for new project received
Lifts (elevators), escalators and moving walks — Risk assessment and reduction methodology — Part 1: General
00.00 Proposal for new project received