Phone: +1 758-453-0049
E-mail: info@slbs.org
Bisee, Saint Lucia LC04301

Projects

Below is a listing of projects past and present carried out by the Saint Lucia Bureau of Standards.

Petroleum and natural gas industry — Pipeline transportation systems — Pipeline integrity assessment specification

50.00 Final text received or FDIS registered for formal approval

ISO/TC 67/SC 2 more

Foundry machinery — Safety requirements for high pressure die casting machines

50.00 Final text received or FDIS registered for formal approval

ISO/TC 306 more

Agricultural and forestry machinery — Unmanned aerial spraying systems — Part 1: Environmental requirements

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 23/SC 6 more

Road vehicles — Data communication between sensors and data fusion unit for automated driving functions — Logical interface

50.00 Final text received or FDIS registered for formal approval

ISO/TC 22/SC 31 more

Styrene-butadiene rubber (SBR) — Emulsion- and solution-polymerized types — Evaluation procedures

50.00 Final text received or FDIS registered for formal approval

ISO/TC 45/SC 3 more

Water quality — Detection of selected congeners of polychlorinated dibenzo-p-dioxins and polychlorinated biphenyls — Method using a flow immunosensor technique

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 147/SC 2 more

Dentistry — Test methods for machining accuracy of computer-aided milling machines

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 106/SC 9 more

Space projects — Programme management — Dependability assurance requirements

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 20/SC 14 more

Determination of particle concentration by small-angle X-ray scattering (SAXS)

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 24/SC 4 more

Measurement of radioactivity — Gamma emitting radionuclides — Reference measurement standard specifications for the calibration of gamma-ray spectrometers

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 85/SC 2 more

UAS traffic management (UTM) — Part 5: UTM functional structure

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 20/SC 16 more

UAS Traffic Management (UTM) — Part 8: Remote identification

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 20/SC 16 more

Optics and photonics — Laser and laser-related equipment — Photothermal technique for absorption measurement and mapping of optical laser components

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 172/SC 9 more

Leather — Per- and polyfluoroalkyl substances — Part 1: Determination of non-volatile compounds by extraction method using liquid chromatography

50.00 Final text received or FDIS registered for formal approval

IULTCS more

Shot blasting machinery — safety and environmental requirements

50.00 Final text received or FDIS registered for formal approval

ISO/TC 306 more

Ships and marine technology — Procedure for testing the performance of continuous monitoring TRO sensors used in ships — Part 1: DPD sensors

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 8 more

Refrigerated display cabinets — Part 1: Vocabulary

50.00 Final text received or FDIS registered for formal approval

ISO/TC 86/SC 7 more

Refrigerated display cabinets — Part 2: Classification, requirements and test conditions

50.00 Final text received or FDIS registered for formal approval

ISO/TC 86/SC 7 more