Phone: +1 758-453-0049
E-mail: info@slbs.org
Bisee, Saint Lucia LC04301

Projects

Below is a listing of projects past and present carried out by the Saint Lucia Bureau of Standards.

Space systems — Project reviews

50.00 Final text received or FDIS registered for formal approval

ISO/TC 20/SC 14 more

Non-active surgical implants — Joint replacement implants — Specific requirements for hip-joint replacement implants

50.00 Final text received or FDIS registered for formal approval

ISO/TC 150/SC 4 more

Non-active surgical implants — Joint replacement implants — Specific requirements for knee-joint replacement implants

50.00 Final text received or FDIS registered for formal approval

ISO/TC 150/SC 4 more

Irrigation techniques — Remote monitoring and control for irrigation — Part 2: Tests

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 23/SC 18 more

Plastics — Determination of thermal conductivity and thermal diffusivity — Part 2: Transient plane heat source (hot disc) method

50.00 Final text received or FDIS registered for formal approval

ISO/TC 61/SC 5 more

Plastics — Determination of thermal conductivity and thermal diffusivity — Part 7: Transient measurement of thermal effusivity using a plane heat source

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 61/SC 5 more

Sustainability in buildings and civil engineering works – Data templates for the use of environmental product declarations (EPDs) for construction products in building information modelling (BIM)

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 59/SC 17 more

Thermal insulation for buildings — Reflective insulation products — Determination of thermal performance

50.00 Final text received or FDIS registered for formal approval

ISO/TC 163/SC 3 more

Railway applications — Railway quality management system — ISO 9001:2015 and specific requirements for application in the railway sector

50.00 Final text received or FDIS registered for formal approval

ISO/TC 269 more

Security and resilience — Emergency management — Part 3: Guidelines for the implementation of a community-based tsunami early warning system

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 292 more

Geotechnical investigation and testing — Testing of geotechnical structures — Part 2: Testing of piles: Static tension load testing

50.00 Final text received or FDIS registered for formal approval

ISO/TC 182 more

Plastics — Carbon and environmental footprint of biobased plastics — Part 4: Environmental (total) footprint (Life cycle assessment)

50.00 Final text received or FDIS registered for formal approval

ISO/TC 61/SC 14 more

Document management — AFP interchange for PDF

50.00 Final text received or FDIS registered for formal approval

ISO/TC 171/SC 2 more

Traditional Chinese medicine — Acupoint magnetotherapy plasters for single use

50.00 Final text received or FDIS registered for formal approval

ISO/TC 249 more

Prosthetics — Testing of ankle-foot devices and foot units — Requirements and test methods

50.00 Final text received or FDIS registered for formal approval

ISO/TC 168 more

Mining – Vocabulary — Part 3: Rock mechanics

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 82 more

Mining — Vocabulary — Part 4: Prospecting and exploration

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 82 more

Mining — Vocabulary — Part 5: Drilling and blasting

50.00 Final text received or FDIS registered for formal approval

ISO/TC 82 more