Phone: +1 758-453-0049
E-mail: info@slbs.org
Bisee, Saint Lucia LC04301

Projects

Below is a listing of projects past and present carried out by the Saint Lucia Bureau of Standards.

Space systems — Safety and compatibility of materials — Part 5: Determination of reactivity of system/component materials with aerospace propellants

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 20/SC 14 more

Safety of machinery — Anthropometric requirements for the design of workstations for industries and services

50.00 Final text received or FDIS registered for formal approval

ISO/TC 159/SC 3 more

Agricultural and forestry machinery — Electromagnetic compatibility — Part 1: General EMC requirements

50.00 Final text received or FDIS registered for formal approval

ISO/TC 23/SC 2 more

Agricultural and forestry machinery — Electromagnetic compatibility — Part 2: Additional EMC requirements for functional safety

50.00 Final text received or FDIS registered for formal approval

ISO/TC 23/SC 2 more

Flow control devices for connection to a medical gas supply system

50.00 Final text received or FDIS registered for formal approval

ISO/TC 121/SC 6 more

Road vehicles — Vehicle dynamics test methods — Part 3: General conditions for passenger cars ride comfort tests

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 22/SC 33 more

Information and documentation — International Standard Musical Work Code (ISWC)

50.00 Final text received or FDIS registered for formal approval

ISO/TC 46/SC 9 more

Washer-disinfectors — Part 1: General requirements, terms and definitions and tests

50.00 Final text received or FDIS registered for formal approval

ISO/TC 198 more

Indoor air — Part 41: Assessment and classification

50.00 Final text received or FDIS registered for formal approval

ISO/TC 146/SC 6 more

Indoor air — Part 42: Measurement of the particle number concentration by condensation particle counters

50.00 Final text received or FDIS registered for formal approval

ISO/TC 146/SC 6 more

Agricultural and forestry machinery — Environmental requirements for sprayers — Part 5: Aerial spray systems

50.00 Final text received or FDIS registered for formal approval

ISO/TC 23/SC 6 more

Footwear — Critical substances potentially present in footwear and footwear components — Test method to quantitatively determine dimethylformamide in footwear materials

50.00 Final text received or FDIS registered for formal approval

ISO/TC 216 more

Information and documentation — Boxes, file covers and other enclosures, made from cellulosic materials, for storage of paper and parchment documents

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 46/SC 10 more

Thermal insulation products — Vacuum insulation panels (VIPs) — Specification

50.00 Final text received or FDIS registered for formal approval

ISO/TC 163/SC 3 more

Space systems — Spacecraft interface requirements document for launch vehicle services

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 20/SC 14 more

Welding — Quality requirements for heat treatment in connection with welding and allied processes

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 44/SC 10 more

Flour from wheat (Triticum aestivum L.) — Amperometric method for starch damage measurement

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 34/SC 4 more

Ceramic tiling systems — Sustainability for ceramic tiles and installation materials — Part 2: Specification for tile installation materials

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 189 more