Below is a listing of projects past and present carried out by the Saint Lucia Bureau of Standards.
Graphic technology — Safety requirements for graphic technology equipment and systems — Part 2: Prepress and press equipment and systems
50.00 Final text received or FDIS registered for formal approval
Graphic technology — Safety requirements for graphic technology equipment and systems — Part 3: Binding and finishing equipment and systems
50.00 Final text received or FDIS registered for formal approval
Graphic technology — Safety requirements for graphic technology equipment and systems — Part 4: Converting equipment and systems
50.00 Final text received or FDIS registered for formal approval
Graphic technology — Safety requirements for graphic technology equipment and systems — Part 5: Manually-fed stand-alone platen presses
50.00 Final text received or FDIS registered for formal approval
Ophthalmic optics — Spectacle frames — Requirements and test methods
50.00 Final text received or FDIS registered for formal approval
Laboratory glassware — Petri dishes
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Determination of particle size distribution — Electrical sensing zone method — Part 2: Tuneable resistive pulse sensing method
50.00 Final text received or FDIS registered for formal approval
Aseptic processing of health care products — Part 1: General requirements
50.00 Final text received or FDIS registered for formal approval
Acoustics — Measurement of sound absorption properties of road surfaces in situ — Part 1: Extended surface method
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Determination of ferrite content in austenitic stainless steel castings
50.00 Final text received or FDIS registered for formal approval
Protective clothing — Mechanical properties — Determination of resistance to cutting by sharp objects
50.00 Final text received or FDIS registered for formal approval
Environmental management systems — Guidelines for using ISO 14001 to address environmental aspects and conditions within an environmental topic area — Part 2: Water
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Environmental management — Requirements with guidance for verification and validation of water statements
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Environmental information — Competence requirements for teams validating and verifying environmental information
50.00 Final text received or FDIS registered for formal approval
Rubber — Determination of solvent extract
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Greenhouse gases — Quantification and reporting of greenhouse gas emissions arising from transport chain operations
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Safety of machinery — Interlocking devices associated with guards — Principles for design and selection
50.00 Final text received or FDIS registered for formal approval
Metallic materials — Charpy V-notch pendulum impact test — Instrumented test method
50.00 Final text received or FDIS registered for formal approval