Phone: +1 758-453-0049
E-mail: info@slbs.org
Bisee, Saint Lucia LC04301

ISO 10784-2:2011

Space systems — Early operations — Part 2: Initialization plan

Nov 29, 2011

General information

90.60     Jun 14, 2022

ISO

ISO/TC 20/SC 14

International Standard

49.140  

English  

Buying

Published

Language in which you want to receive the document.

Scope

A general definition of initialization is that it begins at separation of the spacecraft (SC) from the launcher. In some cases, a more exact definition will be that initialization begins in flight, upon planned change in mode or state of the SC from the launch configuration. Commissioning is completed when the SC, including its payload, is certified for initial mission operations. Prior to certification for mission operations, the SC is described as a test article in the three parts of ISO 10784. ISO 10784 does not include a requirement for contingency plans, but does include a statement of the need for contingency planning.
ISO 10784-2:2011 provides SC manufacturers and operators with a specific form and format to write spacecraft initialization plans required to configure and verify the SC to perform normal mission operations. Since the SC is considered a test article at this phase of its operational life, ISO 17566 is used as a normative reference in constructing the initialization plan. It provides SC manufacturers, operators and other stakeholders with a common language and form to verify and document spacecraft initialization prior to normal SC mission operations.

Life cycle

NOW

PUBLISHED
ISO 10784-2:2011
90.60 Close of review
Jun 14, 2022

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login