Below is a listing of projects past and present carried out by the Saint Lucia Bureau of Standards.
Photography — Processing wastes — Determination of silver content
90.93 Standard confirmed
Monitoring radioactive gases in effluents from facilities producing positron emitting radionuclides and radiopharmaceuticals
60.60 Standard published
Nuclear energy — Soxhlet-mode chemical durability test — Application to vitrified matrixes for high-level radioactive waste
90.93 Standard confirmed
Rare earth — Vocabulary — Part 1: Minerals, oxides and other compounds
60.60 Standard published
Recycling of rare earth elements — Requirements for providing information on industrial waste and end-of-life products
60.60 Standard published
Exchange of information on rare earth elements in industrial wastes and end-of-life cycled products
60.60 Standard published
Management of radioactive waste from nuclear facilities — Part 1: General principles, objectives and practical approaches
60.00 Standard under publication
Photography — Processing waste — Determination of total amino nitrogen (microdiffusion Kjeldahl method)
90.93 Standard confirmed
Photography — Processing waste — Determination of ammoniacal nitrogen (microdiffusion method)
90.93 Standard confirmed
Nuclear energy — Standard method for testing the long-term alpha irradiation stability of matrices for solidification of high-level radioactive waste
90.93 Standard confirmed
Photography — Processing waste — Determination of hydroquinone
90.93 Standard confirmed
Processing photographic wastes — Analysis of cyanides — Determination of hexacyanoferrate (II) and hexacyanoferrate (III) by spectrometry
90.20 Standard under periodical review
Rare earth — Analysis by wavelength dispersive x-ray fluorescence spectrometry (WD-XRFS) — Part 1: Determination of composition of rare earth magnet scraps using standardless XRF commercial packages
40.00 DIS registered
Nuclear energy — Nuclear fuel technology — Methodologies for radioactivity characterization of Very Low Level Waste (VLLW) produced by nuclear facilities
40.20 DIS ballot initiated: 12 weeks