Below is a listing of projects past and present carried out by the Saint Lucia Bureau of Standards.
ISO 20022 Semantic Models — Part 8: Mapping from IFX to the common data model
00.00 Proposal for new project received
ISO 20022 Semantic Models — Part 9: Mapping from BIAN to the common data model
00.00 Proposal for new project received
Ophthalmic implants — Intraocular lenses — Guidance on assessment of the need for clinical investigation of intraocular lens design modifications
00.00 Proposal for new project received
Test code for machine tools — Part 13: Guidelines on acceptance tests for machine tools used as coordinate measuring machines
00.00 Proposal for new project received
Computational Performance Prediction of Fans Based on Multiple Variable Parameters
00.60 Close of review
Fire safety engineering – Approaches to fire safety design of buildings based on fire risk viewpoint
00.00 Proposal for new project received
Guidance on the evaluation and use of patient owned respiratory equipment in the clinical environment
00.00 Proposal for new project received
Fire safety engineering - International review of legislative and administrative bases for performance based fire safety design
00.00 Proposal for new project received
Fire safety engineering - International review of legislative and administrative bases for performance based fire safety design
00.00 Proposal for new project received
Intelligent transport systems — Development of data standards for the parking sector
00.00 Proposal for new project received
Guidelines for acoustic measurements of rheological properties
00.00 Proposal for new project received
Brazing — Grouping systems for materials — European materials
00.00 Proposal for new project received
Brazing — Grouping systems for materials — Japanese materials
00.00 Proposal for new project received
Fire safety engineering — Performance of structures in fire — Part 4: Example of a fifteen-storey steel-framed office building
00.00 Proposal for new project received
Iron ores — Determination of total iron content — Part 3: Calculation method
00.00 Proposal for new project received
Iron ores — Determination of total iron content — Part 3: Calculation method
00.60 Close of review
Environmental damage limitation from fire-fighting water run-off
00.00 Proposal for new project received
Comparison of toxic gas data from different tests — Part 2: Examples of application
00.00 Proposal for new project received