Below is a listing of projects past and present carried out by the Saint Lucia Bureau of Standards.
Design and assessment process of whole-building mechanical ventilation systems in residential buildings
10.20 New project ballot initiated
Wearable electronic textiles — Test method for performance of heating products — Part 1: Heating Temperature and Power Consumption
10.20 New project ballot initiated
Spices and condiments — Dried Lime (Whole & Ground) — Specification
10.00 Proposal for new project registered
Intelligent transport systems (ITS) — Network based precise positioning infrastructure for land transportation — Part 2: Functional requirements and data interface via nomadic device
10.60 Close of voting
Crop protection equipment — Test methods for the evaluation of cleaning systems — Part 1: Internal cleaning of complete sprayers
10.20 New project ballot initiated
Security and resilience — Community resilience — Principles and framework for urban resilience
10.20 New project ballot initiated
Energy efficiency of industrial trucks — Test methods — Part 4: Variable-reach rough-terrain trucks
10.20 New project ballot initiated
Dynamic signs in physical environments — Part 2: Visibility and safety
10.20 New project ballot initiated
Reference Model for Cyber-Physically Controlled Smart Machine Tool Systems (CPSMT) — Part 4: Part 4: Requirements and guidelines for implementing reference architecture of CPSMT for subtractive manufacturing
10.20 New project ballot initiated
Surface chemical analysis — Specimen taking, storage, and transport of biological materials
10.60 Close of voting
Sludge recovery, recycling, treatment and disposal — Vocabulary
10.20 New project ballot initiated
Sludge recovery, recycling, treatment and disposal — Guidelines for risk communication and management of public perception
10.00 Proposal for new project registered
Internal protection by polymeric lining for ductile iron pipes — Requirements and test methods — Part 4: --Part 4: ceramic epoxy lining
10.60 Close of voting
Digital token identifier (DTI) — Registration, assignment and structure — Part 1&2: Part 1
10.20 New project ballot initiated
General requirements of three-dimensional modelling for mechanical products
10.20 New project ballot initiated