Below is a listing of projects past and present carried out by the Saint Lucia Bureau of Standards.
Safety devices for protection against excessive pressure — Part 10: Sizing of safety valves and bursting discs for gas/liquid two-phase flow
50.00 Final text received or FDIS registered for formal approval
Cycles — Safety requirements for bicycles — Part 1: Vocabulary
50.00 Final text received or FDIS registered for formal approval
Cycles — Safety requirements for bicycles — Part 2: Requirements for city and trekking, young adult, mountain and racing bicycles
50.00 Final text received or FDIS registered for formal approval
Cycles — Safety requirements for bicycles — Part 3: Common test methods
50.00 Final text received or FDIS registered for formal approval
Cycles — Safety requirements for bicycles — Part 4: Braking test methods
50.00 Final text received or FDIS registered for formal approval
Earth-mover tyres and rims — Part 1: Tyre designation and dimensions
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Earth-mover tyres and rims — Part 2: Loads and inflation pressures
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Test methods for civil multi-copter unmanned aircraft system
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Textiles and textile products — Microplastics from textile sources — Part 3: Measurement of collected material mass released from textile end products by domestic washing method
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Metallic powders — Determination of oxygen content by reduction methods — Part 2: Loss of mass on hydrogen reduction (hydrogen loss)
50.00 Final text received or FDIS registered for formal approval
Road vehicles — Visibility — Method for establishment of eyellipses for driver's eye location
50.00 Final text received or FDIS registered for formal approval
Traditional Chinese Medicine — Scutellaria baicalensis root
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Ships and marine technology — Sea-going vessels — Windlasses and anchor capstans
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Paints and varnishes — Pull-off test for adhesion
50.00 Final text received or FDIS registered for formal approval
Ships and marine technology — Hydraulic performance tests for waterjet propulsion system
50.00 Final text received or FDIS registered for formal approval
Iron ores for blast furnace feedstocks — Determination of the reducibility by the rate of reduction index
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Guidelines for wastewater treatment and reuse in thermal power plants
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Ships and marine technology — A-frame launch and recovery system
50.00 Final text received or FDIS registered for formal approval