Phone: +1 758-453-0049
E-mail: info@slbs.org
Bisee, Saint Lucia LC04301

Projects

Below is a listing of projects past and present carried out by the Saint Lucia Bureau of Standards.

Thermoplastics pipes and fittings — Vicat softening temperature — Part 3: Test conditions for acrylonitrile/butadiene/styrene (ABS) and acrylonitrile/styrene/acrylic ester (ASA) pipes and fittings

20.00 New project registered in TC/SC work programme

ISO/TC 138/SC 5 more

ISO 25553 — Smart Multigenerational Neighbourhoods- Guidance and Requirements

20.00 New project registered in TC/SC work programme

ISO/TC 314 more

Welding and allied processes — Vocabulary — Part 5: Laser welding

20.00 New project registered in TC/SC work programme

ISO/TC 44/SC 7 more

Welding and allied processes — Vocabulary — Part 6: Resistance welding

20.00 New project registered in TC/SC work programme

ISO/TC 44/SC 6 more

Modular taper interface with ball track system — Part 3: Part 3: Dimensions of shanks, four locking elements

20.00 New project registered in TC/SC work programme

ISO/TC 29/SC 9 more

Metallic materials — Measurement of fracture toughness at impact loading rates using precracked Charpy-type test pieces

10.99 New project approved

ISO/TC 164/SC 4 more

Sintered metal materials, excluding hardmetals — Permeable sintered metal materials — Determination of density, oil content and open porosity

20.00 New project registered in TC/SC work programme

ISO/TC 119/SC 3 more

Sintered metal materials, excluding hardmetals — Tensile test pieces

10.99 New project approved

ISO/TC 119/SC 3 more

General tolerances

20.00 New project registered in TC/SC work programme

ISO/TC 213 more

Health informatics — Information security management in health using ISO/IEC 27002

20.00 New project registered in TC/SC work programme

ISO/TC 215 more

Carbon dioxide capture, transportation and geological storage — Geological storage

20.00 New project registered in TC/SC work programme

ISO/TC 265 more

Carbon dioxide capture, transportation and geological storage — Key performance parameters and characterization methods of absorption liquids for post-combustion CO2 capture

20.00 New project registered in TC/SC work programme

ISO/TC 265 more

Ships and marine technology — Electronic port clearance (EPC) — Part 3: Technical standard for administrative and operational data exchanges

20.00 New project registered in TC/SC work programme

ISO/TC 8/SC 11 more

Hardmetals — Palmqvist toughness test

20.00 New project registered in TC/SC work programme

ISO/TC 119/SC 4 more

Spices and condiments — Preparation of a ground sample for analysis

10.99 New project approved

ISO/TC 34/SC 7 more

Light metals and their alloys — Titanium and titanium alloys — Classification and terminology

20.00 New project registered in TC/SC work programme

ISO/TC 79/SC 11 more

Sampling procedures for inspection by attributes — Part 1: Sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection

20.00 New project registered in TC/SC work programme

ISO/TC 69/SC 5 more

Paints and varnishes — Determination of viscosity using rotary viscometers — Part 1: Cone-and-plate viscometer operated at a high rate of shear

10.99 New project approved

ISO/TC 35/SC 9 more